Herunterladen Inhalt Inhalt Diese Seite drucken

Lubrication; Electrical Connection; First Commissioning - Optimum OPTIdrill B 50GSM Betriebsanleitung

Getriebebohrmaschine
Vorschau ausblenden Andere Handbücher für OPTIdrill B 50GSM:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.5.1

Lubrication

The lubrication and initial greasing of your new machine con-
sists of checking the oil sight glasses. The oil tanks must be
filled to half way up the sight glass. Once these operations
have been carried out, the machine can be started up.
The oil must be changed 200 hours after being filled for the
first time, then after every 2000 operating hours.

Oil level of the gear of the drilling spindle sleeve on page
100
Use the oil types recommended in the reference table

Operating material on page 74. This table can be used
to compare the characteristics of each different type of oil
of your choice.
4.5.2

Electrical connection

CAUTION!
Install the connection cable of the machine in such a way that people will not stumble
over it.
The machine is installed ready for operation with a 400V three-phase plug. Please verify if the
type of current, voltage and protection fuse correspond to the values specified. A protective
earth ground wire connection must be available. Mains fuse 10A to 16A
Make sure that the direction of rotation of the drive motor is correct. The switch position of the
rotation selector switch for right-handed rotation (R) has to turn the drill spindle clockwise. If
necessary two phase terminals on three-phase connector or your three-phase connection must
be exchanged.
WARNING!
The three-phase electrical connection may only be performed by an electrician or under
the guidance and supervision of an electrician.
4.6

First commissioning

WARNING!
First commissioning may only take place after proper installation.
There is a danger to persons and equipment, if the first commissioning carried out by
inexperienced personnel. We do not accept any liability for damages caused by
incorrectly performed commissioning.
ATTENTION!
Before commissioning the machine, all bolts, fastenings and protections must be
checked and retightened as necessary!
Assembly
Version 1.1.4 - 2021-01-04
Translation of original instruction
B50 GSM
EN
81

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

3034500

Inhaltsverzeichnis