3.2

Delivery

INFORMATION
The machine is pre assembled. It is delivered in a transport box. After the unpacking and the
transportation to the installation site it is necessary to mount and assemble the individual com-
ponents of the machine.
Check the status of the machine immediately upon receipt and claim possible damages at the
last carrier also if the packing is not being damaged. In order to ensure claims towards the
freight carrier we recommend you to leave the machines, devices and packing material for the
time being in the status at which you have determined the damage or to take photos of this sta-
tus. Please inform us about any other claims within six days after receipt of delivery.
Check if all parts are firmly seated.
3.3

Unpacking

Install the machine close to its final position before unpacking. If the packaging shows signs of
having possibly been damaged during transport, take the appropriate precautions to prevent
the machine being damaged when unpacking. If damage is discovered, the carrier and/or ship-
per must be notified immediately so the necessary steps can be taken to register a complaint.
Examine the complete machine carefully and check whether all materials, such as shipping
documents, instructions and accessories have been delivered with the machine.
3.4

Lifting the machine

Reclining transport. Dismantle the side parts of the box.
Dismantle the fortifications in the box.
Fit a steel rod 30 mm x approx. 600 mm through the
hole in the drill head. Pull up the machine with a suita-
ble lifting device from the box, and set up the machine
on the floor.
3.5

Installation requirements

Organise the working area around the machine according to the local safety regulations. The
work area for operation, maintenance and repair must not be restrictive.
Follow the prescribed safety areas and escape routes according to VDE 0100 part 729 as
well as the environmental conditions for the operation of the machine.
The main switch of the machine must be freely accessible.
The machine must only be installed and operated in a dry and well-ventilated place.
Avoid places near machines generating chips or dust.
The installation site must be free from vibrations also at a distance of presses, planing
machines, etc.
Provide sufficient space for the personnel preparing and operating the machine and trans-
porting the material.