INSTALLATION OF THE BUILT-IN ROTARY FLANGE

Installation of the dosing pump in the pipe is performed using the supplied built-in rotary flange. The built-
in rotary flange serves as the connecting element to the domestic water installation. The built-in rotary
flange is suitable both for horizontal and vertical pipes. The installation height depends on the pipe course.
The minimum installation height measured from the ground to the middle of the pipe is 64 cm.
The built-in rotary flange must be installed in the direction of flow. This is indicated by
an arrow integral with the casting (see fig. 5).
If this requirement is ignored, the dosing pump will not work.
The flange surface of the built-in rotary flange must be vertical! The built-in rotary flange must be fitted so
that it is free from mechanical stress or strain.
Otherwise mechanical damage to the pipe or the built-in rotary flange up to and including breaks can re-
sult. This can result in severe water damage. Should such an event occur, persons in the vicinity of the dos-
ing pump are exposed to a risk of injury of harm because of the large water volumes that could escape.
Therefore when fitting, ensure that no large forces act on the pipe, built-in rotary flange or dosing pump.
5.6
INSTALLATION OF THE DOSING PUMP WITHOUT A
BYPASS VALVE
Mineral solution container
The mineral solution container can be screwed on during installation of the dosing
pump.
Water meter
Display and
keypad
Fig. 3: Dosing pump without bypass valve
Built-in rotary flange
Suction lance
Power supply unit