SP25M user's guide
http://www.renishaw.com
Using the FCR25 and FCR25 TC
It is assumed that the FCR25 and or the FCR25 TC has been installed on the MRS rack system as described in the
'Mounting an FCR25
and FCR25 TC to an MRS rail
system' pages of this document.
It is also assumed that all SP25M system components have been set up as described in the installation pages of this document. Please
refer to the installation pages for clarification of the various datum positions used in this document.
NOTE: It is necessary to inhibit the probe signal through software during the change routine.
Issued 10 2015
34