10 Start-up

Put the ventilation units into operation as
described below.
Then register the components connected to
the controls in service mode and, if neces-
sary, activate the ModBus interface. With
radio-controlled units, activate the EnOcean
or ModBus interface.
For information about the service mode pa-
rameters  Chapter 14.
When using an RLS 45 K control, PP 45
commissioning software can also be used
 Chapter 15.

10.1 Commissioning pre-requirements

Commissioning is only permitted if:
● the building is ready for occupancy.
● all connection cables are correctly fitted and
secure.
● all protective materials are removed.
● all ventilation units and room air controls are
correctly installed.
Commissioning ventilation system
1. Ensure that all ventilation units, room
air controls and system components are
correctly connected in accordance with the
wiring diagram in the appendix.
2. Remove warning sign. Switch the mains
fuses on. The ventilation units start up in
ventilation level 2 and heat recovery oper-
ating mode.
3. Call up service mode or commissioning
software (PP 45 K) and undertake the
parameter settings  Chapter 14 or 15.
4. Finish by performing a function test:
Test operation and operating modes
Test ventilation levels and Off function
With radio-controlled units, test the
EnOcean functions
Test LEDs on the room air controls
or radio ventilation units  Operating
instructions, Chapter 2.
11 Radio-controlled operation
(EnOcean)
Radio-controlled operation of PP 45 venti-
lation units is realised using EnOcean radio
components.
Purely radio-
PP 45 combi system
controlled
with wired and radio-con-
PP45 system
trolled components
DS 45 RC
+
PP 45 RC
PP 45 RC
...
● PP 45 EO extension module can only be
combined with PP 45 RC unit pairs. Other-
wise, wired operation is required.
● For range of radio components
 Chapter 5, Technical data.
● Radio mode (Maico Smart/EnOcean) is
activated by the specialist installer. Once
radio operation has been activated, you can
teach in/delete EnOcean radio components
directly on the ventilation unit.
11.1 Meaning of the LEDs [17] on the
PP 45 RC
LED
Meaning
Orange LED flashes x times when the heat
recovery (WRG) operating mode is
selected (x = selected ventilation
level). When demand-driven oper-
ation is selected, the LED lights up
for 5 seconds.
Blue
LED flashes x times when the
cross-ventilation operating mode is
selected (x = selected ventilation
level). When demand-driven oper-
ation is selected, the LED lights up
for 5 seconds.
Red
Filter change display and fault
indicator light  Chapter 16.
10 Start-up | UK
RLS 45 K
PP 45 EO
+
+
max. 6
PP 45 RC
PP 45 K
PP 45 O