Herunterladen Inhalt Inhalt Diese Seite drucken

Scope Of Delivery; Required Tool And Auxiliaries - Hauff-Technik MSH Basic-FUBO-SR4 Montageanweisung

Mehrspartenhauseinführung
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

MSH Basic-FUBO-SR4
3
Description: MSH Basic-FUBO-SR4 with MSH Basic-MBK-R4 seal insert
MSH Basic-FUBO-SR4
with adjustment frame
Water barrier flange
Height-adjustable
positioning equipment
4

Scope of delivery

The scope of delivery for the MSH Basic-FUBO-SR4 multiple-service building entry system (main body)
includes:
1 x MSH Basic-FUBO-SR4 main body incl. 4 x pre-installed adaptation pipes and 8 x main body
frames (1 of which includes a red marker)
1 x closing cover
4 x spiral hoses, incl. snap-in sleeves
1 x positioning equipment with ground spike
4a
The package includes the main body (MSH Basic-FUBO-SR4) with pre-installed adaptation pipes, closing
cover and positioning equipment with ground spike. The accompanying flexible hose systems (KES system)
are supplied by the carrier as a separate package – please be aware of this when accepting the goods
(including packages for the building owner)!
5

Required tool and auxiliaries

To install the MSH Basic-FUBO-SR4 multiple-service building entry system (main body) correctly, you will need
the following tools and auxiliaries in addition to the usual tools:
Spirit level
Pliers
Binding wire
Hammer
Yardstick
Lubricant GMT (Article number: 2790009100)
Main body
Wing nut
Ground spike
MSH FUBO-Basic-MBK-R4 seal insert
Adjustable length area
Upper edge of unfinished floor
3-ribbed seal
KES spiral hose with
snap-in sleeve
15
EN

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Msh basic-mbk-r4

Inhaltsverzeichnis