The various connecting cables for power, gas, water and
5
telecommunications can now be fed through the ducts
into the building connection area.
Please contact the relevant service provider before
moving media cables.
The diameters of the cables or pipes must lie within the spe-
cified tolerance range for the particular sealing element.
The blind plug is removed.
(To provide an example, a 29 mm cable diameter = a 20-34
mm sealing element).
Apply a sufficient amount of lubricant GMT to the second
6
sealing element for the gas building entries.
Insert individual sealing elements and a gas building entries
7
into the MSH Basic-MBK-R4 seal insert. Then tighten the
straps for the sealing elements with the plastic tapping
screws until they sit flush with the inner panel of the MSH
or a torque of 14 Nm is achieved.
End result:
A multiple-service building entry system with pre-instal-
led connections for power, gas, water and telecommuni-
cations at finished floor height.
No force should be applied to the gas building entries when connecting to the inner
installation.
Please read the supplementary installation instructions for installation of the rotation and
pull protection for the DN25/32/40 gas building entries!