If positioned correctly, then the main body should stand
9
235 mm above the unfinished floor once concreted in
place.
Depending on the system, it may be necessary to shorten
the main body by up to 155 mm at a later stage to suit
the subsequent floor structure, i.e. the finished floor level.
Please note that the shortening area up to the red
marking is within the range of the finished floor level
(this is important for structures greater than 200
mm or smaller than 155 mm).
After adjusting the height, the MSH Basic-FUBO-SR4 (main
10
body) can be aligned to suit the installation location using
the level provided on the closing cover.
If the floor construction is higher than 235 mm, then the
11
3-ribbed seals on the pipes and the water barrier flange
on the positioning equipment are pushed down at the
same time.
After connecting the pipes, it is important to check
the bending radii of R ≥ 1 m.
The supplied positioning equipment is just a tem-
porary fixing solution. The base plate feedthrough
is not secured firmly in position until it has been
filled directly with sand up to the level of the
granular subbase.
During the filling process, check the distance from
the batter boards and the vertical position of the
component and adjust if necessary.