Interim result:
MSH Basic-FUBO-SR4 (main body) installed vertically,
securely and in the correct position, aligned with the
batter boards and filled with sand.
The upper edge of the finished floor must lie above the red marker unless the floor construction
is higher (see pos. 11). The main body can be shortened as far as the red marker by removing
the individual adjustment frame. If the upper edge of the main body is in line with the upper
edge of the finished floor, then no subsequent work is required.
End result:
MSH Basic-FUBO-SR4 (main body) concreted in place.