MSH Basic-FUBO-SR4
Hammer the ground spike approx. 300 mm into the
4
ground or until it is sufficiently secure.
Remove the impact screw again.
Place the MSH Basic-FUBO-SR4 (main body) on the floor
5
head first.
Apply a sufficient amount of lubricant GMT to the KES
hose systems on the snap-in sleeve side and the sealing
rings at the ends of the pipe.
Attach the KES hose systems to the ends of the pipe using
6
the snap-in sleeve side until this audibly locks into position.
Detail
18
EN