Herunterladen Inhalt Inhalt Diese Seite drucken

Publishing Notes; Explanation Of Symbols; Required Tool And Auxiliaries; Preparing For Assembly - Hauff-Technik FZR-Serie Montageanleitung

Faserzement-futterrohr geschlossen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

FZR
Contents
1

Publishing notes ...............................................10

2

Explanation of symbols ....................................10

3

Required tool and auxiliaries ...........................10

4
Description ........................................................10
5

Preparing for assembly ....................................10

6
Mount the FZR ..................................................10
7
Table ...................................................................11
1
Publishing notes
Copyright © 2020 by
Hauff-Technik GmbH & Co. KG
Dept.:TechnicalEditing
Robert-Bosch-Straße9
89568Hermaringen,GERMANY
Tel.
+4973221333-0
Fax
+4973221333-999
E-mail
offi ce@hauff-technik.de
Internet
www.hauff-technik.de
Reproductionoftheseassemblyinstruction–evenin
extracts–intheformofreprint,photocopy,onelectro-
nicdatamediaorusinganyothermethodrequiresour
writtenconsent.
Allrightsreserved.
Subjecttotechnicalalterationsatanytimeandwithout
priorannouncement.
Theseassemblyinstructioniscomponentoftheproduct.
PrintedintheFederalRepublicofGermany.
2
Explanation of symbols
1
Workstages
Effect/resultofaworkstep
1
Referencenumeralsindrawings
3
Required tool and auxiliaries
ToinstalltheFZRcorrectly,youwillneedthefollowing
toolsandauxiliaries::
Boltcuttersifnecessary(forcuttingoutthereinforce-
ment)
Hammer/tongs
Nails/wire
Additionalstructuralfastenersifnecessary
4
Description
Description:FZRclosed(seefi g.:3).
Legendforfi g.:3
1
Fibrecementwallsleeve
2
Wall/ceiling
10
5
6
1
2
3
Art. Nr.: 5090032057
Rev.: 00/2020-01-16
Preparing for assembly
Extract from Zement-Merkblatt (cement
data sheet) H10 (waterproof concrete):
• The free height of fall of the concrete must
not exceed 1 min order to prevent separati-
on around the entry systems and wall base
points.
• If the height of fall is exceeded, a concrete
bolster with a maximum grain size of 8 mm
and a minimum height of 30 cm may need to
be provided (height = component thickness,
but no less than 30 cm high).
• The individual fi ll layers must be limited to a
maximum of 50 cm and must be compacted
with the internal vibrator.
• The top layer of concrete in walls must be
compacted thoroughly.
Mount the FZR
Fastenthefi brecementwallsleeveintheformwork
usingthe*formworkaids(seefi g.:4).
2formworkaidsarerequiredforeachwallsleeve.
* Formwork aids are not included in the scope of
delivery, please order separately.
Type
FZR-SH80
FZR-SH100
FZR-SH125
FZR-SH150
FZR-SH200
FZR-SH250
FZR-SH300
FZR-SH350
FZR-SH400
In case of wall sleeves with OD 400 mm and
greater, formwork aid must be created on site.
Example:
Fasteninginsteelformworkusingweldedcon-
nectionswithpipeclamp(pipeclampprovidedby
customer)(seefi g.:5).
Example:
Installationinwall/fl oorplateor*ceiling(seefi g.:
6).
* When positioning fi bre cement wall sleeves
around existing cables/pipes, make sure that
the fi bre cement wall sleeve is centred and
fi xed around the cable/pipe before setting in
concrete.
EN
Inner diameter of
wall sleeve D
(mm)
i
80
100
125
150
200
250
300
350
400

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis