Installation: MSH Basic-FUBO-SR4 (main body)
Preparation
Batter boards must be set up the building site to position
the MSH Basic-FUBO-SR4 (main body) accurately. The
string should ideally also mark the upper edge of the
unfinished floor.
The MSH Basic-FUBO-SR4 (main body) and positioning
1
equipment are connected and fixed in place with the
wing nut.
Align the MSH Basic-FUBO-SR4 (main body) with the posi-
2
tioning equipment using the batter boards as a guide and
position lengthwise. Use the level provided on the closing
cover to align the main body horizontally and press him
into the ground.
The precise height here is irrelevant.
•
The inner pipes should be laid parallel to the sides
of the walls.
•
Observe the recommended wall clearance of
min. 5 cm.
•
The main body must not be covered by the inner
walls (unfinished wall + plaster) at a later stage.
•
When positioning the multiple-service building
entry system, it is important to ensure that the
positioning equipment does not obstruct the
empty conduit route (KES spiral hose).
•
Please contact the service provider prior to instal-
lation regarding the necessary distance.
Then loosen the wing nut, hold the ground spike firmly
3
and remove the MSH Basic-FUBO-SR4 main body.
Insert the supplied impact screw into the ground spike and
secure in place with the wing nut.
17
EN
Level