MSH Basic-FUBO-SR4
Interim result:
MSH Basic-FUBO-SR4 (main body) with attached KES
hose systems.
Attach the MSH Basic-FUBO-SR4 (main body) with attached
7
KES hose systems to the hammered in ground spike.
Then align the MSH Basic-FUBO-SR4 (main body) so that it
8
is in line with the height of the unfinished floor level and
parallel to the batter boards.
After adjusting the height, tighten the wing nut to fix the
structure in place.
•
The MSH Basic-FUBO-SR4 (main body) includes an
"upper edge of the unfinished floor" label/marker.
•
The 3-ribbed-seal must be within the concrete of
the ground plate.
•
The water barrier from the ground spike may not
be at the same height as the 3-ribbed seals from
the pipes the due to lack of space.
19