Herunterladen Inhalt Inhalt Diese Seite drucken

Hauff-Technik MSH Basic-FUBO-SR4 Montageanweisung Seite 19

Mehrspartenhauseinführung
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

MSH Basic-FUBO-SR4
Interim result:
MSH Basic-FUBO-SR4 (main body) with attached KES
hose systems.
Attach the MSH Basic-FUBO-SR4 (main body) with attached
7
KES hose systems to the hammered in ground spike.
Then align the MSH Basic-FUBO-SR4 (main body) so that it
8
is in line with the height of the unfinished floor level and
parallel to the batter boards.
After adjusting the height, tighten the wing nut to fix the
structure in place.
The MSH Basic-FUBO-SR4 (main body) includes an
"upper edge of the unfinished floor" label/marker.
The 3-ribbed-seal must be within the concrete of
the ground plate.
The water barrier from the ground spike may not
be at the same height as the 3-ribbed seals from
the pipes the due to lack of space.
19
EN

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Msh basic-mbk-r4

Inhaltsverzeichnis