Routing the Cable Assembly
The cable is wrapped in packing material and attached to the equipment frame
for shipment. Proper cable routing is shown in the following figure.
Figure 10: Correct cable routing on movement frame
Seated Dip Assembly Guide: Routing the Cable Assembly
If necessary, use the following procedure to restore the cable to its original
route.
To route the cable on the movement frame:
1. Using a Phillips screwdriver, remove the screws holding the plastic covers
on the pulleys.
Figure 11: Pulley cover screw location
2. Using a ³ ₈-inch hex bit and a ³ ₄-inch socket wrench, remove the pulley,
bolt, locknut and two washers.
Figure 12: Pulley removal
8