Herunterladen Inhalt Inhalt Diese Seite drucken

Precor Discovery Series Selectorized Line Benutzerhandbuch Seite 63

Inhaltsverzeichnis

Werbung

3. Using a ³ ₄-inch socket wrench and a ³ ₄-inch open-end wrench, remove the
nut and cable retainer on the second pulley.
Figure 20: Cable retainer removal
4. Thread the cable over the pulley and replace the cable retainer, making
sure that the cable is positioned in the pulley groove and under the cable
retainer. Using a ³ ₄-inch socket wrench and a ³ ₄-inch open-end wrench,
tighten the nut to 500 in-lb (56 N-m) of torque.
Seated Dip Assembly Guide: Routing the Cable Assembly
5. Thread the cable down through the opening under the second pulley, as
shown in the following figure.
Figure 21: Cable route down through weight tower frame
13

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis