4. Using a ⁵ ₃₂-inch hex bit, remove the shoulder bolt next to the pulley. Route
the cable around the pulley, then replace and tighten the shoulder bolt.
Figure 16: Cable and shoulder bolt position
5. Replace the kick cover and then the pulley cover using a ⁵ ₃₂-inch hex bit.
Seated Dip Assembly Guide: Routing the Cable Assembly
Threading the Cable Through the Top Frame of the
Weight Tower
The cable passes through an opening in the top of the weight tower frame,
over the pulleys and then back down through the frame to the weight stack.
Use the following procedure to remove both cable retainers and the pulley that
covers the opening where the cable passes upward through the frame.
Figure 17: Position of cable over pulleys
11