Herunterladen Inhalt Inhalt Diese Seite drucken

Route The Cable Assembly - Precor Vitality Series Selectorized Line Handbuch

Inhaltsverzeichnis

Werbung

Route the Cable Assembly

1.
Screw one end of the cable assembly into the top of the weight stack stem.
CAUTION: Be sure that at least seven (7) threads are inserted into the fitting.
2. Pull the cable through the top of the weight tower frame, over the top of the
center pulley, and under the cable retaining bracket.
3. Pull the cable to the top outside pulley, routing the cable under the cable
retaining bracket, over the top of the pulley and down to the pulley at the
cam support plate. Be sure that the cable retaining brackets do not interfere
with the travel of the cable.
Note: The pulleys do not need to be removed.
4. Route the cable under the pulley, through the frame upright and under the
cam. Attach the cable to the cam and secure with an M4-15 mm screw.
Note: The screw is pre-assembled to the cam. First, remove the screw,
install the ball at the end of the cable into the cable retaining slot on the
cam, and replace the screw.
Vitality Series Selectorized Line Seated Leg Curl Assembly Guide: Assemble the Equipment
Figure 6: Cable assembly detail
8

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis