(5)
Remove screws (2) - (4)
3
Open perforated plate
4
(2)
Route the data cable into the de-
5
vice through the center rubber bu-
shing
(3)
(4)
Attach 9-pin D-Sub plug to data
6
cable
Connect the data cable to the con-
7
nection (5) at the fieldbus coupler
Secure the data cable with cable
8
ties
Screw the perforated plate back in
9
place with the original screws
Screw the device covers back on
10
with the original screws
-
Tightening torque of the
screws for Robacta TX, TX 10i,
TX/i TWIN = 10 Nm (7.38 ft-lb)
-
Tightening torque of the
screws for Robacta FB 8I_8O
= 4 Nm (2.95 ft-lb)
43