Herunterladen Diese Seite drucken

ACD GRUPPE MAX BE Kurzanleitung Seite 76

Mobiler arbeitsplatz
Vorschau ausblenden Andere Handbücher für MAX BE:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

20.2.4.2 Mode 2: charging with the integrated charger
NOTE
To charge the MAX BE Li-Ion, switch off at the On/Off switch.
Switch off the MAX Li-Ion mobile workstation and the equipment connected to it by pressing the On/Off
switch on the front (switch light goes out). Plug the charger connection cable into a stationary 230 V AC
shockproof socket.
You will see that the charging process has begun by looking at the front of the battery controller; the battery
capacity in percent will rise slowly after plugging in.
Figure 24: MAX Li-Ion charging cable
CAUTION
To synchronize the displayed charge level with the actual charge level of the batteries, the mobile
workstation MAX should be fully charged after each use.
If the mobile workstation MAX is not used for a longer period of time, it must be charged every
four weeks.
NOTE
The lithium-ion batteries have the advantage that interim charging is possible, i. e. you can
interrupt the charging process at any time.
However, if the MAX BE Li-Ion switches off automatically when the residual capacity of the battery
drops to approx. 10 %, a charge to > 15 % battery capacity must be carried out. Not until that is
reached can the mobile workstation be switched on again.
This means you can use any breaks in your work, lunch break etc. to charge up the battery.
A complete charge for a battery that has discharged down to 10 % capacity back up to 100 %
charge takes about 5 to 6 hours.
When the display shows 100 %, the lithium-ion batteries are fully charged and you can use the mobile
workstation for the time specified in the technical data (see chapter 25).
MAX BE_Kurzanleitung_Brief_Overview_V1.00_de_en
76 / 100

Werbung

loading

Diese Anleitung auch für:

Max be li-ionenMax be tk