Herunterladen Inhalt Inhalt Diese Seite drucken

Inspection And Maintenance - Optimum Optidrill DX 13V Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Optidrill DX 13V:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.8

Inspection and maintenance

Interval
every 50 hours
as required
according to operator's, in
accordance with German
DGUV (BGV A3)
as required
EN
DX13V | DX15V
56
Where?
What?
Spindle, Table
Oiling
mount, Column
Drill Head
Cleaning
Housing
Electrical
Electronics
inspection
Drill chuck
Re-adjust the
protection
guidance
Originalbetriebsanleitung
How?
With non-corroding oil
with plastic cleaning agents

Obligations of the operating company on
page 40

Electrical system on page 43

Electrical connection on page 50
Remove the drill head housing.
Re-adjust the clamping in guidance of
drill chuck protection.
1
Version 1.0.4 - 2021-08-30
Operation

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Optidrill dx 15v302 0150302 0155

Inhaltsverzeichnis