Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting The S9M; Mounting With Tension/Compression Bars - HBM S9M Montageanleitung

Vorschau ausblenden Andere Handbücher für S9M:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Rigid force transfer
Fig. 7.1
Transducer orientation during mounting
Notice
Please note the maximum permissible load­carrying capacity of the loading fittings and of
the tension/compression bars, screws and knuckle eyes.
7.3

Mounting the S9M

7.3.1

Mounting with tension/compression bars

In this mounting variant, the transducer is mounted with tension/compression bars on a
construction element and can then be measured in the tensile and compressive direc­
tions. Alternating loads are also correctly recorded if the transducer is mounted without
axial play. For dynamic alternating loads, the upper and lower threaded connectors must
be pre-stressed to above the maximum operating load and then locked in place.
1. Installation and locking with initial stress (recommended mounting variant):
-
Screw in the threaded connector
-
Pre-stress transducer to 110 % operating load in tensile direction
-
Hand-tighten the locknut
-
Unload the transducer
2. Installation and locking with torque
-
Screw in the threaded connector
-
Tighten the locknut to the following torques:
Nominal (rated) force in kN
0.5 ... 1
2 ... 10
14
Ó Ó Ó
correct
Thread on transducer
Rigid force transfer
M8
M12
Ó Ó Ó
incorrect
Tightening torque in NVm
15
50
MECHANICAL INSTALLATION
S9M

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis