Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly / Connection; Assembly; Wall Mounting: Dryexx; Connection - ECOLAB Lubo-DryExx-Basic Bedienungsanleitung

System für die dosierung
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.

Assembly / Connection

5.1

Assembly

®
The
DryExx
connection and wall mounting on delivery. The metering stations are only to be used
with a
DryExx
5.1.1
Wall Mounting:
360
Lubo DryExx®
410
Install the metering station as close as possible to where the lubricant is stored
CAUTION
(canister, barrel, container, tank) to ensure that the suction tubing is as short as possible.
5.2

Connection

5.2.1
Connection Overview:
Fig. 5.2
Pos
Description
1
User connection, R ¾"
2
3/2-Way-Solenoid valve, pre-control valve
3
2/2-Way-Diaphragm valve, pneumatic controled
4
Return connection for hose 12/21
5
Lubricant connection, pressure side.
6
Lubricant connection via suction lance
7
Diaphragm compressed air pump
8
Compressed air connection, applicator pump
9
Compressed air filter regulator
10
Compressed air connection, 8/6
417101633_DryExx_Basic
metering stations
are pre-assembled by the manufacturer and are ready for
®
control unit, through which electrical power must also be supplied.
®
DryExx
Fig. 5.1
For wall mounting the following parts are supplied:
Piece
4
4
4
4
Make sure there is adequate access for maintenance
to be carried out!
®
DryExx
Unit type 182830
Description
Wood screws, 8 x 60 mm
Wall fixing plugs
Spacer
Disc
Fig. 5.3
- 28 -
Article no.
413110926
417200005
38631302
413500313
Unit type 182831
Rev.: 6-02-15

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

182830182831182836

Inhaltsverzeichnis