Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly / Connection; Asembly; Wall Mounting: Dryexx; Connection - ECOLAB Lubo-DryExx Advanced AB Betriebsanleitung

System für die dosierung
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.

Assembly / Connection

5.1

Asembly

®
The
DryExx
connection and wall mounting on delivery.
The metering stations are only to be used with a
electrical power must also be supplied.
5.1.1
Wall Mounting:
Fig. 5.3
Lubo DryExx®
Install the metering station as close as possible to where the lubricant is stored (canister,
CAUTION
barrel, container, tank) to ensure that the suction tubing is as short as possible.
5.2

Connection

5.2.1
Connection Overview:
Fig. 5.1
type 182830
417102248_DryExx_Advanced_AB
metering stations
are pre-assembled by the manufacturer and are ready for
®
DryExx
360
For wall mounting the following parts are supplied:
Pcs.
Make sure there is adequate access for
maintenance to be carried out!
410
®
DryExx
Fig. 5.2
®
DryExx
control unit, through which
Description
4
Wood screws, 8 x 60 mm
4
Wall fixing plugs
4
Spacer
4
Disc
type 182831
- 33 -
Article no.
413110926
417200005
38631302
413500313
Pos.
Description
1
User connection, R ¾"
3/2-Way-Solenoid
2
valve, pre-control valve
2/2-Way-Diaphragm
3
valve, pneumatic
controled
Return connection for
4
hose 12/21
Lubricant connection,
5
pressure side.
Lubricant connection
6
via suction lance
Diaphragm
7
compressed air pump
Compressed air
8
connection, applicator
pump
Compressed air filter
9
regulator
Compressed air
10
connection, 8/6
3/2-Way-Solenoid
11
valve, control valve
pump
Rev.: 2-01.15

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis