Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Setting Up The Running Gear; Required Tool; Mounting The Power And Gas Supply - Abicor Binzel ABIBUG 300 Originalbetriebsanleitung

Orbitalschweißautomat
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6 Commissioning

6.1 Setting up the running gear

The running gear must be positioned on the positioning belt before assembly. Three running gear steps are
possible, depending on the pipe diameter to be welded.

Required tool:

6.2 Mounting the power and gas supply

Required tool:
EN - 20
— AF10 fork wrench
Rotate the device to the service position.
1
Loosen the screws (4× M6 ×16) using the socket
2
wrench (AF10) and remove them completely.
Select the corresponding hole, insert the screw
3
and tighten by hand.
Carry out the process for all four screws.
4
— AF19 fork wrench
— AF8 Allen key
Switch off the device at the On/Off switch.
1
The LED is extinguished.
ABIBUG 300

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis