Herunterladen Diese Seite drucken

Put In Function; Switching Off - Hendi 250VV Bedienungsanleitung

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 20

PUT IN FUNCTION

EN

SWITCHING OFF

In succession, the switching off must follow what
here under indicated:
• Before the switching off wait the working conclu-
sion, or wait that the feed product has reached
the desired solidity,
• Stop the machine releasing the foreseen control
14
The machine operator can put in function the ma-
chine following in order the under reported indica-
tions:
• Positive controls result for the preparation pre-
liminary operations,
• Positive controls result for the electric feeding,
• Plug connection in opportune current socket,
• Positive controls result for the assembly,
• Positive controls result / checks before the starting,
• Positive controls result finalized to check the re-
spect of all safety conditions,
• Introduce manually the feed product inside the pot,
• With the use of both the hands take the machine
in the foreseen zones:
– Place it with the tool inside the pot,
– Start, maintain and handle it up to the end of
the feed product work,
• When the food product has reached the desired
solidity, stop the machine and placed on a sup-
port adequate bench,
• Discharge manually the pot feed product, taking it
with both the hands and pouring out the feed
product where necessary.
It is forbidden to introduce the machine in the pot,
more than the immersion nick and however over
the tool blocking nut.
It is recommended to make not work the machine
on vacuum.
We recommend to control periodically the tire
gasket integrity placed under the blade (see draw-
ing) and change it if it is damaged or worn.
The gasket integrity prevents the working product
seepage inside the tool avoiding damages to the
mixer.
devices,
• Place the machine on a support adequate bench
• Disconnect the plug from the machine from the
feeding socket,
• Perform the cleaning interventions.

Werbung

loading