Herunterladen Inhalt Inhalt Diese Seite drucken

HEIDELBERG Suprasetter 106 Installation Seite 56

Vorschau ausblenden Andere Handbücher für Suprasetter 106:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
Fig. 27 Transport safeguard: Laser carriage
Fig. 28 Transport safeguard: Thermostatic tube
Fig. 29 Transport safeguard: Roller / VCT bar left
54
Unscrew two screws on either side of the laser
carriage ( Fig. 27/1 and 3) and remove the trans-
port safeguard (bracket, Fig. 27/2).
Insert the two M6 screws provided in the accesso-
ries kit into the rail (Fig. 27/3) if No. 32 is marked
in the modification label.
Cut the cable-tie and loosen the screw. Remove
the transport safeguard (bracket, Fig. 28/1) stabi-
lizing the thermostatic tube.
Cut and remove the cable tie (Fig. 29/2) securing
the roller.
Cut and remove the cable tie (Fig. 29/1) securing
the VCT bar (VCT = Vacuum Channel Terminator).

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis