Herunterladen Inhalt Inhalt Diese Seite drucken

Putting The Load Down - Releasing - probst SH-3500-B Betriebsanleitung

Vakuum-anbaugerät
Vorschau ausblenden Andere Handbücher für SH-3500-B:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

OPERATION
WARNING
The operator handle (1) is adjustable for comfortable handling.
1
Putting the load down – releasing
1.
Carefully lower the load (to approx. 20 cm above the ground).
WARNING
2.
Detach the load securing chain and pull it out from under the load.
3.
Place the load securing chain back into the chain case.
4. Set the lifting device and the attached load down on a level surface free of obstructions.
40
Risk of injury from falling objects
Never quickly move the lifting device with lifted load over uneven surfaces.
1.
The operator handle (1) can be arrested in five different positions using two
latching bolts (10).
2.
The operator handle (1) can be moved freely once the latching bolts (10) are
turned 90 degrees.
Risk of load falling when removing the load securing chain
This may cause crushing injuries.
Do not reach underneath the load when removing the load securing chain.
10
10

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sh-3500-b-ffs

Inhaltsverzeichnis