General notes regarding damage to property and products
3.2

Installation and assembly

Metal burrs from drilling and sawing work
Possibility of short-circuits, damage to electrical equipment, unex­
pected plant reactions!
"
All affected components in the switch cabinet should be well parti­
tioned prior to all work!
Non-compliance will result in the extinction of any warranty
claims.
"
Remove all metal burrs carefully after work.
Water leakage while connecting cooling water lines
Possibility of damage to the electrical equipment, unexpected
plant reactions!
"
All affected components in the switch cabinet should be well parti­
tioned prior to all work!
Non-compliance will result in the extinction of any warranty
claims.
"
Remove residual moisture carefully after work.
Leakage in the cooling fluid circuit
Possibility of damage to the electrical equipment, unexpected
plant reactions!
Install the water-cooled modules so that the units inside the switch
"
cabinet are sufficiently protected against leaking cooling water.
Heat accumulation caused by insufficient clearance
Possibility of temporary interruption of the welding process, a re­
duced useful life of the product, destruction of the device, damage
to the electrical equipment, unexpected plant reactions!
Make sure that an installation clearance of at least 50 mm remains
"
on the side of the inverter in mounting position to neighboring
components of the welding cabinet.
PRC7000 |
NOTICE
R911172834 / 02