13. If sufficient PV power is present and the grid code
conditions are met, the inverter starts the operation. For
battery storage systems, a successful battery start and
the fulfillment of the Grid-Code requirements is
necessary.
14. During commissioning it is possible to download a
commissioning report in the Reports menu. The report
contains information about inverter settings, including
actual disconnection values for each inverter. By
clicking the folder icon in the menu Reports, it is
possible to open a folder for commissioning reports
(incl. grid code information) (see 15).
Figure 15: LCS-Tool - commissioning report