Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Device Maintenance - EKOM DUO Benutzerhandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

DUO, DUO 2V, DUO 2

MAINTENANCE

DEVICE MAINTENANCE

Warning!
The operator shall ensure completion of repeated testing of the device at least once every 24
months (EN 62353) or at intervals defined by applicable national legal regulations. A record
of these test results shall be completed (e.g. per EN 62353, Annex G) together with the
measurement methods.
The device has been designed and manufactured to keep maintenance to a minimum. The following
work must be performed to retain the proper and reliable operation of the compressor.
Before starting compressor maintenance work, it is necessary to check it the
compressor can be disconnected from the device to ensure that the person using
the device is not at risk of health damage and there is no risk of any other material
damages!
Air pump components (head, cylinder, pressure hose, etc.) are very hot during and
shortly after compressor operation – do not touch these components!
Repair works beyond normal maintenance can be performed only by qualified
personnel or he manufacturer's customer service.
Use only spareparts and accessories approved by the manufacturer.
PROTECT EYESIGHT, WEAR GOGGLES, WHEN VENTING COMPRESSED AIR
FROM THE COMPRESSED AIR CIRCUIT (AIR TANK).
The work below may only be performed by trained personnel as follows:
BEFORE STARTING ANY MAINTENANCE WORK, FIRST DISCONNECT THE
COMPRESSOR FROM THE MAINS (PULL OUT THE MAINS PLUG) AND VENT THE
COMPRESSED AIR FROM THE AIR TANK.
05/2018
- 31 -
NP-DUO-2_05-2018-MD

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Duo 2vDuo 2

Inhaltsverzeichnis