14. MAINTENANCE SCHEDULE

Notice!
The operating entity is obliged to ensure that all tests of the equipment are carried out repeatedly at
least once within every 24 months (EN 62353) or in intervals as specified by the applicable national
legal regulations. A report must be prepared on the results of the tests (e.g.: according to EN 62353,
Annex G), including the measurement methods used.
Time interval
1 x day
1x per week
1x per week - check function
Once annually
1 x every 2 years
1 x every 2 years or after 5000
hours
1 x every 2 years or after 8000
hours
8,000 hours (or 2 years)
16,000 hours (or 4 years)
24,000 hours (or 6 years)
09/2014
Calculated when equipment is switched on
Calculated using the number of operating hours
Maintenance that must be performed
Emptying condensate
At high air humidity
Compressors without air dyers
Compressors with air dryers
Equipment cleaning
Check of dryer function
Safety valve check
M2
Replacement of output filter in dryer
Replace float in water separator
MD
Replace filter and micro-filter
elements
Check tightness of joints
and overall inspection of the equipment
Conduct "repeated test"
pursuant to EN 62353
Replace inlet filter and pre-filter
M2
Replace drying media
NDL
Replacement maintenance kit - dryer
Replace media in both dryer cylinders
and seals.
Replace media in both dryer cylinders
and seals.
Replace media in both dryer cylinders,
seals and all valves.
- 19 -
Performed
Chapter
by
15.2
User
15.1
15.3
15.4
15.6
15.7
15.8
15.9
Maintenance
documentation
14
Qualified
technician
15.5
Maintenance
documentation
15.10