7. Because the annual total is not updated until the end of a
week and the weekly and monthly totals at the end of each
day, the weekly or monthly totals can exceed the annual total
initially.
CAUTION
Damage to the remote display
The batteries must be removed, if no display is installed in
the StecaGrid Remote.
5.3
Installation of the StecaGrid Remote for two
or three control units StecaGrid Control
Solar energy systems which exceed the 16 A mains current
rating must be split up into individual networks of a ma-
ximum of 16 A (1 StecaGrid 300 units / 7 StecaGrid 500
units), where each network is connected to its own control
unit. Data from a maximum of three networks can be pro-
cessed by a single remote display.
1 1
Install the inverters and the control unit as described in
Chapters 3 and 4. This system is referred to below as
'system A'.
2 2
Remove the display and fit the transmitter in its place.
See the illustration in chapter 5.1.
3 3
Remove the display from the second control unit, fit
the display from system A in its place and install the
control unit. This now referred to as 'System b'
4 4
Remove the display and fit the second transmitter in its
place.
5 5
If desired, fit the display from system A to the third sys-
tem and install the control unit. This system is referred
to below as 'system c'.
6 6
Remove the display and fit the third transmitter unit in
its place.
7 7
Now install the remote display as described in 'Installa-
tion of the StecaGrid Remote'.
'rF 2', or 'rF 3' is displayed after the display test: this
indicates how many data communication links have
been established.