Steca Grid 500 Installationsanleitung Seite 43

Überwachungseinheit; fernanzeige
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

1
DIN rail
/3 StecaGrid 300/500
4
Data connector
5
AC connector
6
StecaGrid Control
7
DC input
(Solar panel)
8
Mains cable
DC input
(Solar panel)
/
Optional
150 mm
fig. 1
Installation of the inverter
(and the control unit StecaGrid Control)
1 1
Fix two DIN rails to the mounting surface as shown
in figure 1. The position of the lower DIN rail can also
be determined by first attaching two inverters to the
upper rail.
Three fixing holes can be used if only a single unit is to
be installed (see figure ).
2 2
Position the first inverter on the rails with the solar
panel connection terminals on top.
Slide the locking clip supplied with the unit (at the
bottom/middle of the unit) downwards.
717.545 | 08.13
AC output
153 mm
ENGLISH
5 3 m m
2 2 8 m m
fig. 
43