Initial commissioning of the inverter

8.8.1
Function
Conditions for starting initial commissioning
Initial commissioning starts automatically when at least the AC connector has been installed and
switched on as described previously.
If initial commissioning is not fully completed then it starts again anew the next time the device is
switched on.
Guided initial commissioning
Initial commissioning is a guided procedure that sets the following information:
• Display language
• Date / Time
• Country
• Reactive power characteristic curve (if prescribed for the selected country)
Setting the country
The following applies when setting the country:
• The country set must always be the same as the country where the inverter is installed. This
causes the inverter to load the prescribed permissible deviations for grid voltage and frequency
applicable to the selected country; more information on this is provided in the Table of coun-
tries, p. 78.
• The country can only be set once!
Contact your installer if you have set the wrong country.
• Contact your installer if you cannot select the country where your inverter is installed.
• The country setting does not affect the language used on the display. The display language is set
separately.