TS19
Temperature sensor at middle of cylinder 1 (transfer /
primary store system)
TS20
Temperature sensor at top of cylinder 2 (transfer system)
VS1
3-way valve for central heating backup (
VS2
3-way valve for cylinder 2 (solar thermal system) with valve
VS3
3-way mixer for return temperature control (
VS4
3-way valve for cylinder 3 (solar thermal system) with valve
WM1
Water meter
4

Commissioning

First make all electrical connections correctly and only
then carry out the commissioning!
▶ Follow all installation instructions for all components
and assemblies in the system.
▶ Only switch on the power supply when all modules
are set up.
NOTICE: Risk of damage to system through pump failure!
▶ Fill and vent the system before switching it on so that
the pumps do not run dry.
4.1

Setting the coding card

When the coding switch is in a valid position, the indicator lights up
green continuously. When the coding switch is in an invalid position or an
intermediate position, the indicator does not light up initially. It then
starts to flash red.
Heat
Programming
appliance
System
II
1 A ...
1 A ...
1 B ...
1 B ...
1 A ...
1 A ...
3...
4 ...
Table 14 Assigning the module function via coding switch
Heat pump
Other heat sources
1...
Solar thermal system 1
3...
Transfer system 3
4 ...
Primary store system 4
II
Sense II
III
CS 200
IV
HPC 400/HMC300
If the coding switch at the module is set to 8 or 10, do not
establish the bus connection with a heat source.
MS 200
)
)
Coding,
Coding,
unit
module 1
module 2
III
IV
1
1
1
1
10
10
8
7
4.2

System and module commissioning

4.2.1

Solar system settings

1. Set the coding card.
2. Set the coding card on other modules as applicable.
3. Switch on the power supply (mains voltage) to the entire system.
When the module indicator lights up green continuously:
4. Commission and set up the user interface as described in the
accompanying installation instructions.
5. Select the installed functions in the Solar settings > Change solar
configuration menu and add them to the solar thermal system.
6. Check the settings for the solar system at the user interface and
adjust the solar parameters if required.
7. Start the solar system.
4.2.2

Settings for transfer and primary store systems

1. Set coding switch at MS 200 for the primary store system to 7, or 8
for the transfer system.
2. Set the coding card on other modules as applicable.
3. Switch on the power supply (mains voltage) to the entire system.
If the status indicators on the modules light up green continuously:
4. Commission and set up the user interface as described in the
accompanying installation instructions.
5. Select the functions installed in the Transfer settings > Change
transfer configuration menu and add to the transfer system or
adjust the primary store system in the DHW settings menu.
6. Check the system settings at the user interface and, if required,
adjust the transfer parameters or DHW system I settings.