Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Location And Alignment Of The Tank; Tank Installation; Wiring - Panasonic PAW-TA20C1E5C Technisches Handbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 10
PAW-TA20C1E5C

INSTALLATION LOCATION AND ALIGNMENT OF THE TANK

The tank is to be installed so that it is accessible for maintenance work. A minimum clearance of 1000 mm is required in front of
and to the side of the tank.
Removal of the casing
1.
Loosen the screws at the lower edge of the front
and remove.
2.
Take hold of the front casing in the lower area
and remove carefully.
3.
Loosen the screws at the lower edge of the casing
(left/right) and remove.
4.
Grasp the lower part of the casing and
remove carefully.

TANK INSTALLATION

Connection from the rear

WIRING

Tank terminal box
2
1
3-way valve
Storage tank
sensor
24
4
3
Id.Nr. 248611-3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis