Herunterladen Inhalt Inhalt Diese Seite drucken

Hauff-Technik MSH Basic FUBO SR4 BHP Montageanleitung Seite 4

Mehrsparten-bauherrenpaket für gebäude ohne keller
Vorschau ausblenden Andere Handbücher für MSH Basic FUBO SR4 BHP:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mehrsparten-Bauherrenpaket
MSH Basic FUBO SR4 BHP
• 1 sleeve cap MS78 D0 as blind plug
• 1 gas end cap ABG63/70/78 1x32/40/50
• 1 tube of lubricant
Storage
NOTICE!
Damage due to improper storage!
Significant damage can occur in the event of improper storage.
• The Multi-line building package is to be protected from damage, damp and soi-
ling prior to installation. Only intact components may be installed.
• The Multi-line building package must be stored in such a way that it is not ex-
posed to low temperatures (<5 °C), high temperatures (>30 °C) or direct sun-
light.
Disposal
If no return or disposal agreement has been concluded, recycle dismantled com-
ponents after they have been properly dismantled:
• Metal remains are to be scrapped according to existing environmental regulati-
ons.
• Dispose of elastomers according to existing environmental regulations.
• Dispose of plastics according to existing environmental regulations.
• Dispose of packaging material according to existing environmental regulations.
4
Art. Nr.: 3030476041 Rev.: 00/2022-10-26

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis