Installation

Check that the drilling machine foundation is horizontal with a spirit level.
Check that the foundation has sufficient load-bearing capacity and rigidity.
Place the drilling machine on the provided foundation.
Fix the drilling machine base to the substructure through the holes pre-drilled for this pur-
pose.
WARNING!
The condition of the underground and the fixing type of the machine foot to the
underground must be in a way that it can bear the loads of the drilling machine. The
foundation must be level. Check that the drilling machine foundation is horizontal with a
spirit level.
3.5.1

Fixing

In order to provide for the necessary stability of the drilling machine,
it is necessary to firmly connect the drilling machine with its foot to the substructure.
We recommend that you use shear connector cartridges or heavy-duty anchors.
Fix the foot of the drilling machine
to the substructure with the holes
pre-drilled for this purpose.
The through-bore are marked with
arrows on the machine base.
Version 2.2.6 - 2020-07-21
Through-
bore
Arrow sign
Abb.3-8:
Labelling of the anchorage points on drilling machine B24H- B24HV
Arrow sign
Through-bore
Abb.3-9:
Labelling of the anchorage points on drilling machine B28H- B28HV
Translation of the original instructions
B24H | B24HV | B28H | B28HV
GB
103