Herunterladen Inhalt Inhalt Diese Seite drucken

Assembling The Removable Part Of The Side Channel; Installing The Upvc Zip Channels - Renson Fixvent Mono AK/UT EVO Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Fixvent
Mono AK/UT
®
en
6 • Assembling the removable part of the side channel
6.1 • Installing the uPVC zip channels
1
2
50
• Fixscreen
EVO
• Slide the uPVC zip channels
over the zip on the screen
fabric (1) and then put them
back into the fixed part of
the side channels on the left
and right (2).
Mono AK
®
Pay attention to the correct
direction of the uPVC
zip channel. There is a
V-shaped recess, which must
always be positioned on the
upper side.
The gap in the zipper must be
placed over the plate of the
guiding channel's fixed part.
EVO

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Fixscreen mono ak evo

Inhaltsverzeichnis