Herunterladen Inhalt Inhalt Diese Seite drucken

Fitting The Front Of The Housing; Fitting The Welding Sockets - Fronius Transpocket 1500 Erdstrom Serviceanleitung, Ersatzteilliste

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Removing the
front of the
housing
(continued)
Fig.16
Fitting the front
of the housing
- Affix the adhesive label (26), (27) or (28) to the front of the housing
- Press the front of the housing (23) onto the floor of the housing until it snaps into the
Fig.17
Fitting the
- Working from the outside, insert welding sockets (13) and (14) into the front of the
welding sockets
- TP 1500 TIG: Screw the
- TP 1500 / 1500 RC: Screw the
Note! Before affixing the adhesive label (26), (27) or (28), clean the front of the
housing.
catches
(92)
(23) (26, 27, 28)
housing (Fig.13 and Fig.14)
the housing, using the M5x12 - TX20 screw (70)
-
Tighten the M5x12 - TX20 screw (70) with a torque of 2 Nm, holding the copper
bracket firmly as you do so
brackets in the inside of the housing, using M5x12 - TX20 screws (70)
-
Tighten the M5x12 - TX20 screws (70) with a torque of 2 Nm, holding the copper
brackets firmly as you do so
- Prise the front of the housing (23) off
the floor of the housing
(23)
- Screw the 5x10 - TX20 screw into the
floor of the housing
socket to the appropriate copper bracket in the inside of
socket and the
110
socket to the appropriate copper

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis