Herunterladen Inhalt Inhalt Diese Seite drucken

Informal Safety Precautions; Safety Precautions At The Installation Location; Safety Precautions In Normal Operation; Safety Inspection - Fronius Transpocket 1500 Erdstrom Serviceanleitung, Ersatzteilliste

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Informal safety
precautions
Safety
precautions at
the installation
location
Safety
precautions in
normal operation

Safety inspection

Standard
IEC (EN) 60 974-1
BGV A2, §5
BGV D1, §33 / §49
VDE 0701-1
VDE 0702-1
The service manual must be kept at the power source location at all times.
In addition to the service manual, copies of both the generally applicable
and the local accident prevention and environmental protection rules must
be kept on hand, and of course observed in practice.
All the safety instructions and danger warnings on the power source itself
must be kept in a legible condition.
The power source must be placed on an even, firm floor in such a way that it
stands firmly. A power source that topples over can easily kill someone!
Special regulations apply to rooms at risk from fire and/or explosion
- observe all relevant national and international regulations.
By means of internal instructions and checks, ensure that the workplace and
the area around it are always kept clean and tidy.
Only operate the power source if all its protective features are fully
functional.
Before switching on the power source, ensures that nobody can be
endangered by your turning on the machine.
At least once a week, check the power source for any damage that may be
visible from the outside, and check that the safety features all function
correctly.
The owner/operator is obliged to have the power source checked by a
trained electrician to ensure that it is in a proper condition after any
alterations, installations of additional components, modifications, repairs,
care and maintenance, and in any case at least every twelve months.
Further information on corrective maintenance, modification and inspection
of welding power sources is available from your regional or national Fronius
service centre,who will be pleased to provide you with a copy of the Work
Instruction "Safety Inspection of Welding Machinery" (AA-PMÜ-01) upon
request.
Title
Arc welding equipment, Part 1: Welding power sources
Electrical plant and facilities
Welding, cutting and allied processes
Repair, modification and inspection of electrical appliances -
Part 1: General requirements
Repeat tests on electrical appliances
12

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis