Herunterladen Inhalt Inhalt Diese Seite drucken

Opening The Housing; Care And Maintenance; Regular Checks And Care; Checking And Setting The Maximum Welding Amperage - Fronius Transpocket 1500 Erdstrom Serviceanleitung, Ersatzteilliste

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Opening the housing

Opening the
(34)
housing
Fig.1
Fig.2

Care and maintenance

Regular checks
and care
In order to keep the power source operational for years to come, you should observe
the following points:
-
-
-
Checking and
setting the
maximum
welding
amperage
(36)
(35)
(21)
(37)
Warning! An electric shock can be fatal. Before opening up the welding
machine, switch it off, unplug it from the mains and put up a warning sign to
stop anybody switching it back on again. If necessary, discharge the
electrolytic capacitors.
Carry out safety inspections at the stipulated intervals (see the section headed
"Safety rules")
Depending on the machine location, but no less often than twice a year, remove the
housing and blow the inside of the power source clean with dry, oil-free, reduced-
blow compressed air. Do not aim air-jets at electronic components from too close a
range.
If a lot of dust has accumulated, clean the cooling-air ducts.
Note! Whenever the LCA 15 board is replaced, it is necessary to check and set
the maximum welding amperage (see the section headed "Measuring,
inspection and adjustment jobs").
- Remove the carrying strap
- Undo the 5x25-TX20 screw (34) in the
front of the housing
- Undo the 5x25-TX20 screw (35) in the
rear of the housing
- Carefully lift the housing and unplug
the "Housing earthing conductor" (36)
- Remove the housing stiffening
reinforcement (21)
- Remove the p.c.-board insulator (37)
33

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis