Herunterladen Inhalt Inhalt Diese Seite drucken

Machine In Use With Direct Water Connection; Use Of The Machine; Preparation Of The Machine; Water Tank Machine Or Machine In Use With Water Tank - Profitec PRO 800 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für PRO 800:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3
Fill the water tank with fresh water deficient in lime, place it back into the water tank guides and
replace the cup warming tray.
4
Plug your machine into an outlet. Switch your machine on by placing the metal switch into the upward
position. Now the boiler is being heated and the green signal lamp lights up. The pump is activated
and fills the boiler with fresh water.
5
Since much water is used for the initial filling of the boilers, the water tank has to then be refilled with
water.
6
As soon as the steam boiler is filled with water, the pump will become silent and the PID-display
(below the drip tray) will show the current temperature of the boiler (reg. item 3.3). When the fresh
water in the water tank drops to a certain level, the machine turns off the orange signal lamp and the
PID-display goes off. You now have to refill fresh water. The machine automatically heats up again.
7
Please wait until the boiler pressure gauge indicates a value of about 1.0 bar (0,1 MPa)
MPA).
8
Manual boiler venting is not necessary because the PRO 800 contains a professional Anti-Vacuum
valve, which vents the boiler during the heat-up phase.
9
The machine is now operational. To always have pre-heated cups, place them on the cup warming tray
and start enjoying your coffee.

5.2 Machine in use with direct water connection

1
Plug the machine into an electrical outlet. Turn the machine on by placing the metal switch into the
upper position. The coffee boiler is now being heated and the green control lamp will come on. In order
The orange control lamp now lights up. Caution! Please make sure that the switch for the direct water
through the pressure in the hose.
2
As soon as the boiler is filled with water, the PID-display (behind the drip tray) indicates the current
water temperature (reg. item 3.3). Please wait until the boiler pressure gauge shows a value of about
1.0 bar (0,1 MPa) to 1.25 bar (0,125 MPa).
3
A manual boiler venting is not necessary because the PRO 800 contains a professional Anti-Vacuum
valve, which vents the boiler during the heat-up phase.
4
The machine is now ready for use. Put the cups on the cup heater tray in order to preheat them and
enjoy your coffee.
Before preparing the first coffee, please rinse the machine by extracting about 2-3
water tank fillings. Let the water run out of the hot water wand
When using a shut-off valve, please be sure to close the valve after having finished
operations. Make sure that the machine is placed in a watertight area.
Portafilter, cup warming tray and drip tray are not suitable for the dish washer.
6

USE OF THE MACHINE

6.1 Preparation of the machine

The switched off machine is to be placed into operation as follows:

6.1.1 Water tank machine or machine in use with water tank

1
Fill the water tank.
2
Make sure there is enough water in the tank.
3
Now turn the machine on (the metal switch in the upper position and the right switch behind the drip
4
Please wait until the gauge indicates a value of 1.0 bar (0,1 MPA) 1.25 bar (0,125 MPA) and the desired
temperature is reached.
5
In general, the machine will be heated up in about 40 minutes, depending on the ambient
temperature.
Translation of the original German user manual
. The machine is now on. The boiler is filled with fresh water
ENGLISH
1.25 bar (0,125
26

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis