Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 113
USE

10. Daily operation

"Before setting the machine to work, make sure that:
• the main electric power switch is on;
• the mains water tap has been turned on".
1
on
Press the backlit main switch to turn on the machine.
3
If one of the
keys is pressed, coffee will be served at
the temperature reached at that moment.
All of the other keys are disabled because the working
pressure has not been reached.
While waiting for the machine to be ready for use, insert
the filter holders in the units.
Coffee unit symbols
2
During this phase, the boilers are loaded and the heating
phase begins.
4
The preset working pressure must be reached before the
machine is ready for use.
Boiler temperature indication.
Pre-infusion phase, represented with the symbol
duration.
Dispensing phase, represented with the symbol
duration.
bar indicating the total progress of the operation.
This icon appears when the coffee boiler is switched on and indicates
when the set temperature has been reached.
This icon indicates that the coffee boiler is heating up.
11 EN
ChECK BoIlER
and relative
and relative

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis