Herunterladen Inhalt Inhalt Diese Seite drucken

Preliminary Operations - Faema E71 E Gebrauch Und Installation

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 113
handling
Staff responsible for moving the appliance must be aware of the risks in moving heavy
loads.
Move the appliance carefully, using, where possible, the correct lifting equipment (fork
lift, for example).
If moving the appliance by hand, make sure:
- enough people are available for the task, depending on the appliance weight and how
difficult it is to handle;
- to always use the necessary safety equipment (shoes/gloves).

Preliminary operations

4 EN

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis