Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Commissioning; Unpacking; Assembly; Cover Removal - Beissbarth MS 63 Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
en
26 | MS 63 | Initial commissioning
4.

Initial commissioning

4.1

Unpacking

1. Remove the iron tape and the fixing clamps from the
pallet and the packaging cardboard.
i
After unpacking check the integrity of MS 63 and
check that no components are visibly damaged. In
case of doubt do not proceed to start-up and con-
tact a qualified technician and/or your vendor.
2. Take out of the transport crate the standard accesso-
ries and the packaging materials.
i
Dispose correctly of packaging material, hand it over
to the designated collection points.
4.2

Assembly

4.2.1

Cover removal

1. Unscrew the 4 screws of the side cover and remove
the cover itself.
4.2.2

Lifting of the tilting column

1. Unscrew the fulcrum-pin screw of the column with
the hex key 6 and remove the pin.
|
1 695 106 288
2013-10-30
2. Get a 1 Mt lifting sling, DR 50 model (safety factor
6:1); wrap the sling around the tilting column (1),
extend the bead breaking arm and lift the column
with a hoist (2).
2
1
3. Remove the external elastic ring with appropriate
pliers and take off the pin.
4.2.3

Column fixing

1. Align the cylinder rod and the tie rod holes.
2. Insert the air tube in the slot in the machine box.
Beissbarth GmbH

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis