Herunterladen Inhalt Inhalt Diese Seite drucken

Decommissioning; Pump/Unit Remains Assembled; Pump/Unit Is Dissembled And Stored - BADU Normblock Multi Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
Commissioning/Decommissioning
Risk of frost:
1.
Drain the pump and pipes.
2.
Store the pump and pipes at risk of freezing in a dry place
with no risk of frost.
6.2

Decommissioning

For pre-requisites for shutting down the pump "Switching the
pump off" on page 27
NOTICE
For idle periods exceeding one year, elastomer components must
be renewed.
6.2.1

Pump/unit remains assembled

Switch the pump/unit on regularly – monthly to quarterly –
during long idle periods. Switch the pump back off again after
approx. 5 minutes.
This will avoid deposits forming in the pump/unit and piping
system.
NOTICE
The pump/unit can be damaged if it runs dry!
Ensure that the pump/unit is always full of water.
6.2.2

Pump/unit is dissembled and stored

Drain pump/unit. See point 8.3 on page 36
Clean and dry pump/unit.
Store pump/unit. See point 4.3 on page 19
28 EN
04/2019

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis