Herunterladen Inhalt Inhalt Diese Seite drucken

Putting The Unit Into Operation - Sirona C1+ Gebrauchsanweisung

Vorschau ausblenden Andere Handbücher für C1+:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Sirona Dental Systems GmbH
4

Putting the unit into operation

59 06 446 D 3386
D 3386.201.01.08.02
OFF
ON
4 Putting the unit into operation
Initial start-up
The disinfection system adds a disinfectant to the water
(1:100) to prevent the formation of microorganisms in
the water system.
Prior to initial start-up of your treatment center, sanita-
tion must be performed.
If, on the basis of an agreement with you, sanitation was
not performed by the service engineer following installa-
tion of your treatment center, please perform sanitation
as described in the separate instructions "Care and
Cleaning by the Practice Team".
Sanitation takes approx. 24 hours.
Main switch
Switch ON the main switch ( l ).
Following power-up, the treatment center automatically
performs a self-test.
The displays on the dentist and assistant elements light
up; the treatment center is ready for operation.
CAUTION
For safety reasons, always switch the treatment center
OFF (O) after consulting hours.
This cuts off air, water and line voltage.
You can communicate with your treatment center via
dialogs.
The functions are selected by activating the gray keys
next to the symbols.
13

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis