Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting Procedure - Mitsubishi Electric ecodan ERSE series Installationshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 42
4
Installation

Mounting procedure

1. Install the included back plate accessory.
* When installing the back plate, use locally-supplied screws and compatible fixing plugs.
<Front view>
Notch
Wall
Screw mounting holes
<Figure 4.1.4>
<Side view>
Back plate (horizontal)
Wall
Plugs
<Figure 4.1.5>
<Front view of unit>
Hook
(on the back
of casing)
Back plate
Unit
2. Insert the hook on the back of the hydrobox behind the notch of the back plate.
*The lifting up of the hydrobox is facilitated by first tilting the unit forward using the included packaging cushioning.
Note: Hold the MAIN BODY of the hydrobox when carrying or mounting the hydrobox to a wall.
Holding and supporting the unit by the manometer, water pipe, or refrigerant pipe may result in breakdown of the components and impact on unit's conditions of warranty.
Hook
Back plate
Unit
<Figure 4.1.7>
Back plate
Screws
Screwdriver
600
Centre line
<Figure 4.1.6>
<Process 1>
Tilting the unit.
Wooden packaging base
<Accessory>
Back plate
● Ensure that the notch is positioned at the TOP of the back plate.
The back plate is provided with screw mounting holes that are round or oval.
To prevent the unit from falling off the wall, choose the appropriate number
of holes or hole positions and horizontally secure the back plate to the
appropriate wall location.
● Figure 4.1.6 shows the relative positions between the unit and the wall secured
back plate.
Referring to the <Figure 4.1.3> Service access, install the back plate.
<Process 2>
Unit
Packaging cushion
<Figure 4.1.8>
<Unit: mm>
Removing the wooden
packaging base.
10

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis