Herunterladen Inhalt Inhalt Diese Seite drucken

Dantherm RCC 130 Bedienungsanleitung Seite 42

Übersetzung der originalbetriebs- und serviceanleitung
Vorschau ausblenden Andere Handbücher für RCC 130:
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 129
42
6. Connect the air ducts according to the description in the chapter Installation options.
Important: The air ducts T1 and T4 must ALWAYS be routed to the duct connections at
the bottom of the unit.
NOTICE
Damage to the unit due to water accumulation
If the unit is mounted vertically on the wall, the optional sealed air duct for the exhaust air (T4)
must not be used (on the left or right depending on the operating mode, but always to the
side of the active condensate drain). Failure to do so may cause water to accumulate and
damage the unit.
• In the case of vertical mounting, do not use the sealed air duct for the exhaust air on the
longer side of the unit. The duct outlet must be sealed.
A
Fig. 32: Vertical wall mounting – prohibited duct connections
7. Connect the hose of the condensate drain.
INSTALLATION AND SERVICE MANUAL FOR PROFESSIONALS
Installation: Assembly
B
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rcc 220

Inhaltsverzeichnis